Malossi razrada;
RUNNING IN
After fitting the kit it is advisable not to press more than halfway on the accelerator and not to exceed 6.000 rpm for the first 40-60 minutes of running.
After this time the running in stage may be considered complete.
If these instructions are followed the engine can begin to give excellent performance.
MAINTENANCE
Every 3000 km decarbonize the head, the piston crown, the exhaust and the silencer.
Check that the piston rings are not carbonised and check also for wear at the meeting point.